D46 motorway (Czech Republic) - significado y definición. Qué es D46 motorway (Czech Republic)
DICLIB.COM
Herramientas lingüísticas IA
Ingrese una palabra o frase en cualquier idioma 👆
Idioma:     

Traducción y análisis de palabras por inteligencia artificial

En esta página puede obtener un análisis detallado de una palabra o frase, producido utilizando la mejor tecnología de inteligencia artificial hasta la fecha:

  • cómo se usa la palabra
  • frecuencia de uso
  • se utiliza con más frecuencia en el habla oral o escrita
  • opciones de traducción
  • ejemplos de uso (varias frases con traducción)
  • etimología

Qué (quién) es D46 motorway (Czech Republic) - definición

CZECH MOTORWAY
Expressway R46; R46 expressway (Czech Republic)
  • 20px
  • 20px

D46 motorway (Czech Republic)         
D46 motorway (), formerly Expressway R46 () is a highway in southern Czech Republic. It was built from 1974 to 1992.
Austria–Czech Republic relations         
BILATERAL RELATIONS BETWEEN CZECH REPUBLIC AND AUSTRIA
Austrian-Czech relations; Austria-Czech Republic relations; Austria - Czech Republic relations; Austria – Czech Republic relations; Czech Republic–Austria relations; Czech Republic - Austria relations; Czech Republic-Austria relations; Czech Republic – Austria relations; Czech Republic Austria relations; Austria Czech Republic relations
Neighborly relations exist between Austria and the Czech Republic, two member states of the European Union.
Cyprus–Czech Republic relations         
BILATERAL RELATIONS BETWEEN CZECH REPUBLIC AND CYPRUS
Cyprus – Czech Republic relations; Cyprus-Czech relations; Cyprus - Czech Republic relations; Cyprus-Czech Republic relations
Cyprus-Czech relations are foreign relations between Cyprus and the Czech Republic. Cyprus has an embassy in Prague.

Wikipedia

D46 motorway (Czech Republic)

D46 motorway (Czech: Dálnice D46), formerly Expressway R46 (Czech: Rychlostní silnice R46) is a highway in southern Czech Republic. It was built from 1974 to 1992. Currently, as the D1 highway is not finished yet, it carries all international traffic, but after completion of it, it will have only regional traffic in central Moravia.